Project presentation
The project called Planet Zanzibar 1 was originally designed as an exclusive club project, which main idea was to build and operate a luxury residential facility on Zanzibar Island.
Location
Villa A – 250 sqm living space. Part of Villa A is an outdoor terrace of 100 sqm and a private pool. The villa is a one-story building.
Villa B – 250 sqm living space + covered terrace of 100 sqm. The villa is a ground floor building.
Construction
LIGHT GAUGE STEEL PREFABRICATED HOUSING SYSTEM
This system, using cold-formed galvanized / aluminized zinc light gauge steel framing as load-bearing structure, integrated with cladding material of heat insulation, sound insulation, water proof and fire resistant, is one kind of multi-functional, energy saving and eco-friendly housing systems. As a mature technology its all components can be produced on a large scale and the operation at construction site is only to assemble all components. Due to manufacturer’s information the lifetime of construction is at least 70 years.
Features
The interior equipment and appliances will be tailored to the customer’s individual requirements. High quality materials used, modern furniture and branded electrical appliances are a matter of course in the villa. All rooms are air-conditioned and equipped with aluminium windows and doors with Thermal Brake technology and double glazing. This allows low energy consumption and maintain a pleasant climate to be kept inside the building
For each owner
Available on site
Price and terms of payment
The price calculated as per 1 sqm ready made villa is 3500 EUR. The price depends on the living space of each house.
Villa A – 250 sqm living space. Part of Villa A is an outdoor terrace of 100 sqm and a private pool. The villa is a one-story building.
Villa B – 250 sqm living space + covered terrace of 100 sqm. The villa is a ground floor building.
The price for all costs (labour and material) associated with the real estate construction shall be paid by the Customer in the form of 4 installments as follows:
- 1st installment of 30% of the purchase price of the property against the signature of the Work Contract by both parties
- 2nd installment of 30% of the purchase price of the property, after completion of the superstructure (the shell) (main structure body)
- 3rd installment of 30% of the purchase price of the property, after the installation of interior, appliances and furniture
- 4th installment of 10% of the purchase price of the property represents the total financial settlement of the work based on the work and supplies. The Contractor shall have the right to issue the final invoice on the day of signing the handover and acceptance protocol. The Customer is obliged to take over the construction and pay the remaining amount within 30 days from the day of handing over the works.